QA/StaffMeetings/QA-Staff-02-29-2012

From MozillaWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

« previous mtg | QA Staff Home | next mtg »

QA Staff Meeting Notes February 29, 2012

Meeting Details

 # Every Weds @ 1:30p Pacific Time - Mozilla HQ, Warp Core 
 #
 # Vidyo:  https://v.mozilla.com/flex.html?roomdirect.html&key=UK1zyrd7Vhym
 # Phone:  +1 650 903 0800 or 650-215-1282 x92 Conf# 95312 (US/INTL)
 #         +1 800 707 2533 (pin 369) Conf# 95312 (US Toll Free)
 #         +1 416 848 3114 x92 Conf# 95312 (Canada)
 # IRC:    irc://irc.mozilla.org:6697/#qa

QA Org Items

  • New Hires & Interviews
    • item
  • Community Members Onboarding
    • Mohamed (past intern) back doing more work for apps qa
  • Upcoming Events
    • item
  • PTOs
    • marcia 3/1-3/2
    • juanb 3/26 - 4/6 (two weeks)

QA Team Updates

Desktop Firefox (Juan)

  • Fx.Next
    • 11.0b5 available for testing (test plan), targeting release on Friday
    • 11.0b6 go to build Monday, targeting release on Wednesday
    • 3.6.13 -> 10.0.2 live yesterday, targeting major updates for straggler releases (3.6.* and Betas)
    • Windows 2000 support dropped for Nightly as of today (bug 699247)
    • Feedback of "slowness" have increased by ~50% between Firefox 10 and 11
      • Please run the Beta as your daily build and report any noticeable slowness to Juan, Anthony, and Cheng
      • We are trying to reach out to anyone who can reproduce any "slow" condition
      • There's a thread on r-d titled "Re: Slowness reports on beta, what to do"
  • Firefox ESR (ashughes)
    • 10.0.3 go to build Friday (based on Firefox 11)
  • Crash Investigation
  • Automation
    • Vlad and Alex now have commit access, will hopefully accelerate our landing performance

Apps Desktop and Mobile (DavidC)

  • What happened this week?
    • Finalized top apps quality analysis to determine what apps to demo (jsmith)
      • MWC apps selected is here
      • Quality analysis is here
      • Tagged Soup release 0.4 with MWC blockers all fixed
    • Supported MWC demo team as needed (e.g. IT Support document, answer questions, top apps screenshots) (jsmith + tchung)
  • Myapps staging server
    • Deployed Myapps rpm, Appsync rpm
    • DNS changes were approved and put in place
  • MochiTest WebApps
  • What's next?
    • Verify that we can test the myapps staging service using the extension, firefox, chrome..etc.
    • Post-MWC cleanup (e.g. make sure bugs are all logged, documentation updated for test cases, apps strategy on-going) (jsmith)
    • Web compatibility discussion and analysis (fennec + apps)
    • Manual test run to check quality state of desktop app experience (jsmith)
    • MWC QA Retrospective (jsmith + marlena)

Browser Technologies (Tony)

  • Issues
  • Fennec (Kevin/Aaron)
    • Doing daily triage and bug noms against this list (from Mobile/Triage page)
      • M: 9am PST, W,F: 7am PST, T,Th: 1pm PST
    • Discussion on breaking out automated fennec smoketests in robocop
      • Tests will be organized here
    • Daily testing on Maple and Nightly builds
    • Stability (nhirata)
  • Sync (Tracy)
    • Sign off on a small desktop train last week
    • tested around Android Sync bookmarks improvements
    • blogging about sync QA to commence this week (I've never been a good writer, so I'm just a leettle ascared to start)
  • Test pilot (tracy)
    • nothing to report this week
  • Sync Server (jbonacci/jrgm)
    • security review of tokenserver
  • BrowserID (jbonacci/jrgm)
    • browserid train-2012.02.16 going to production today (02/29)
  • Pancake (nhirata)
    • Need to work on cleaning up the bug database and catching up
  • B2G/WebAPIs (jhammink)
    • MWC workweek was a success!
    • doing tri-weekly test pass against latest b2G gonk gaia. Test Spec and Test Log is here: http://shrt.st/2dck
    • also triaging bugs for gonk/gaia
    • redoing test plan against M2.1 Target: https://wiki.mozilla.org/Gaia/Planning/2.1#Projects
    • also looking into automation plan; some scripts ready for mozSMS, mozTelephony - still needing edge case work
    • adding one more build machine to support new targets (Maguro/Akami)

WebQA (Stephen)

  • Affiliates
    • Successful 2.22.12 release
    • no release this week - Flux team is having a workweek
  • AMO
    • We shipped marketplace.mozilla.org yesterday.
    • AMO 6.4.4 is scheduled to go out tomorrow (03/01).
    • We've got mobile tests
    • Merged another contributor test
    • Thanks to Automation Services for their help this week!
  • Engagement Projects
    • Likely shipping Flicks today
    • DTPT phase II on hold for security review
    • Betafarm is now in process
  • Mozilla.com
    • shipped 1.8 milestone
  • Mozillians
    • Feature testing is currently blocked by bug 731206
    • We have 2 new contributors on the project. One WebDev and one QA.
  • MDN
    • shipped 2.3 milestone
  • Socorro
    • 2.4.4 milestone successfully released today
    • May do an out of band release to land ESR support
  • SUMO
    • 2/28 release went out
    • 3/6 in process

Community (Marcia)

  • Events
  • Upcoming Testdays/BugDays/Meetups
    • SUMO Questions day tomorrow
    • Aurora Features testday friday
    • Browser ID testday next week
  • Video Work
    • Planned work on new nightly first page video will resume next week
  • QMO.next (Raymond):

QA Automation Service (Henrik, David)

General

  • Helped BrowserID get up and running with a CI

Project updates

On-Demand Test Framework (Geo)
  • Updating deployment documentation for Windows slaves
  • Modifying job creation scripts to accurately replace previously created jobs
Mozmill 2.0 Automation Scripts Update (Henrik)
  • David Guo is investigating if a smooth upgrade of our scripts to Mozmill 2.0 is possible
  • If it turns out end of this week it's not possible, we will start from scratch
CI system for daily and l10n Firefox Builds (Henrik)
  • Added mozilla-esr10 builds to test matrix
  • Fixed some smaller bugs
Mozmill Dashboard Validation (DavidB)
  • No update
MemChaser extension (Henrik)
  • Repository has been moved to https://github.com/mozilla/memchaser
  • Working excessively on getting version 0.2 released with incremental GC support - hopefully we can upload the version on AMO later today
  • CI Setup is done and runs on every commit
Open Positions (DavidB)
  • No update
Weekly Blog Posts
Case Conductor
  • Still working with IT on getting 0.8 deployed to staging.
    • Haven't heard from them in a couple days, so I bumped the priority to Critical and pinged mrz and solarce (the IT guy assigned)
  • Requested the infrrasec review
  • Working with Ubuntu on their evaluation
  • Stephend and I to start getting Jenkins setup to run tests once staging -dev server is setup.
  • 1.0 still slated for 3/30

Roundtable/Discussion Items

  • item

Notes, Takeaways and Action Items

Today

  • Add notes here

Last Meeting

  • Action Items