Services/Meetings/2012-02-28

From MozillaWiki
Jump to: navigation, search
  • Time: Tuesday at 9:15 AM PST / 12:15 PM EST / 5:15 PM UTC.
  • Place: Mozilla HQ, Sick Bay (Vidyo room "Services")
  • Phone (US/Intl): 650 903 0800 x92 Conf: 98616#
  • Phone (Toronto): 416 848 3114 x92 Conf: 98616#
  • Phone (US): 800 707 2533 (pin 369) Conf: 98616#

Who's away?: ….

Ops

Engineering

Sagrada

Metrics (rmiller)

  • Refactored generally useful mozsvc pieces into metlog-py
  • Added extensibility to Metlog client
  • Started poking at BrowserId-Sync integration
  • Finalizing logstash CEF output module
  • new metlog-py release imminent

SyncStorage (rfkelly)

  • added macauth token support into mozsvc
  • implemented behind-the-scenes database changes
  • now working on build/test/deploy stuff

Queuey (bbangert)

  • Finished API redesign of queuey
  • Working on Moar docs
  • Add Metlog?
  • Start on load testing and load testing scripts

Token Server (tarek)

Last week

  • polished and prepared circus for a release [circus]
  • added a funkload bench [token server]
  • plugged circus into powerhose [powerhose]
  • plugged everything in token server so running it runs n circus-ed processes
  • Refactored PyVEP to be easily extensible regarding c++; changed the way tests are conducted [PyVEP]
  • implemented a secrets file manager [token]
  • moved the certificate handling into a separate certificates module [PyVEP]
  • First version of the pure python powerhose worker for crypto [tokenserver]
  • started to discuss the sql switch [token server]

This week

  • finish the sql backend implementation [token server]
  • finish the pure python powerhose worker for crypto [token server]
  • plug the c++ worker [token server]

Cornice (tarek)

Last week

  • allow support of custom status code for errors

This week

  • nothing planned for now

Sync

Firefox Sync (gps)

  • Landed HTTP MAC API support in s-c
  • Token server client review underway
  • Identity and auth refactor feedback underway (250K patch for rnewman, muhahaha)
  • Protocol 2.0 patch ongoing.

Android Sync (rnewman)

Notifications

Bipostal (jrconlin)

  • Fun with Entropy (you down with me?)
  • break user & email into separate fields
  • continue test buildup

Client/Server (jbalogh)

  • @ Urban Airship

QA

Testing and Sign-offs (tracy)

  • Sign off on a small desktop train last week
  • tested around Android Sync bookmarks improvements
  • blogging about sync QA to commence this week (I've never been a good writer, so I'm just a leettle ascared to start)

Sync Server (jbonacci)

  • Testing continues as needed for any Sync Server deployments and Change/Maintenance Windows.
  • QA tested the "phx1 external zeus cluster upgrade": https://intranet.mozilla.org/Services/Ops/ChangeWindow_20120225
  • Got a local install of Sync 2.0 up and running on Ubuntu 11 with help from rfkelly.
    • Will be trying to generalize the installation so we can use on OPs VMs like qa1
    • Will continue working with rfkelly to get local/VM install pointing to his Sync 2.0 API server: http://sync1.web.mtv1.dev.svc.mozilla.com/
  • QA test planning in in progress for the following projects:
    • MetLog
    • BiPostal
    • Token Server
    • Sync 2.0/Token Server combo

BrowserID (jbonacci)

  • Finishing up on Train 21
    • Bug 727995 - QA and deploy BrowserID train-2012.02.16 to production
    • HotFix: Bug 729561 - BrowserID: Deploy hotfix to production at 1pm pacific
  • Getting Zak up-to-speed on some basic black box testing
  • We have another Test Day planned for Friday, March 9
    • Themes: UI, primary support, localization
  • QA test planning for PHX1 build-out this week or next

BrowserID automation (jrgm)

TPS (jgriffin)

Deployment Requests

Support

Metrics

Reports and Monitoring (daniel)

Product

Sync

Firefox 10

Firefox 11

Firefox 12

Firefox 13

Beyond

Identity

Security

  • Token Server threat modeling session 2/29 12PM Pacific
    • MV 2JK
    • SF0 7B
  • Token Server testing to start this week
  • Rescheduling of queuey review

Marketing

Roundtable

2012Q1 Goals

2012Q2 Goals

Beyond

Notes and actions

  • Tarek's Show and Tell

Follow ups from last week

Other issues