Connected Devices Weekly Update/2016-05-31: Difference between revisions
Jump to navigation
Jump to search
(→Current Projects: adding Magnet project) |
LRSaunders (talk | contribs) No edit summary |
||
| (2 intermediate revisions by 2 users not shown) | |||
| Line 10: | Line 10: | ||
! style="background:#00EC00;" | On Target | ! style="background:#00EC00;" | On Target | ||
| | | | ||
* | * Team is currently working on narrowing their target user and solidifying a hypothesis | ||
* | * Based on the user research some pivots need to be made in the product and the team is aiming to have that done with the MVP in place for London | ||
*You can see the updated list of next steps in the [https://docs.google.com/spreadsheets/d/1va8WoQnug6McFrzDluoQfxhoRFc6K238Ob8F2PfilOg/edit#gid=0 Vaani Milestones] | |||
*London Demos | |||
**Vaani on RPi | |||
***Real time infotainment | |||
***Home automation and device control | |||
** Kitchen Timer using voice | |||
|- | |- | ||
| [https://wiki.mozilla.org/Project_Link Project Link] | | [https://wiki.mozilla.org/Project_Link Project Link] | ||
| Line 118: | Line 124: | ||
! style="background:#00EC00;" | On Target | ! style="background:#00EC00;" | On Target | ||
| | | | ||
* | * First integration of a train with CD Metrics: | ||
* | ** The team has been helping to Smart Home team to collect data in real time and building the dashboards that will help them to identify usage patterns in his second User Study. | ||
** It's been done through Google Analytics, POST request, Big Query and Periscope to visualize the data. It's been a success that has helped CD team to verify the chosen framework and also a great feedback to improve our CD library (e.g. it's been added TimeStamp parameter) | |||
* Team is also working in compiling Metrics library into a Raspberry Pi. | |||
* [[Connected_Devices/Projects/Metrics|Metrics wiki]] have been updated with all the info about the new CD Framework for collecting Metrics based on [https://developers.google.com/analytics/devguides/collection/protocol/v1/ Google Analytics Measurement Protocol API] and the use of Big Query together with several visualization tools to ensure that metric data can be easily analyzed by the trains. | |||
|- | |- | ||
| [https://wiki.mozilla.org/Connected_Devices/Research Research Team] | | [https://wiki.mozilla.org/Connected_Devices/Research Research Team] | ||
| Line 125: | Line 135: | ||
! style="background:#00EC00;" | On Target | ! style="background:#00EC00;" | On Target | ||
| | | | ||
* | * Research on the backlog of new ideas has begun! | ||
* | *You can see the scores on the [https://mana.mozilla.org/wiki/display/PM/Idea+Proposals+-+Research+Team+Review Mana] | ||
*For further information about how a product was scored, please click on the "full review" link in the backlog table. | |||
*The team is taking this week to review the research perimeters and ensure they are in line with how we would like to score each of the products | |||
*The team is going to be pulling out and posting key learning in the table as well this week | |||
|- | |- | ||
! rowspan = " | ! rowspan = "3" | Firefox OS Smartphone Sunset | ||
[https://wiki.mozilla.org/Smartphone_Transition Smartphone Transition Wiki] | [https://wiki.mozilla.org/Smartphone_Transition Smartphone Transition Wiki] | ||
| Smartphone Commercial Sunset (Karen) | | Smartphone Commercial Sunset (Karen) | ||
| Line 134: | Line 148: | ||
| | | | ||
* [https://wiki.mozilla.org/Smartphone_Commercial_Transition Smartphone Commercial Transition Wiki] | * [https://wiki.mozilla.org/Smartphone_Commercial_Transition Smartphone Commercial Transition Wiki] | ||
* | * Plan to continue support thru Q1 2018. Have some logistics to resolve for the period from Jan 1 2017 to March 31 2018. Will continue to keep an eye on that. | ||
|- | |- | ||
| Code Transition (Julie) | | Code Transition (Julie) | ||
| Line 141: | Line 154: | ||
| | | | ||
* [https://wiki.mozilla.org/SmartPhone_Code_Transition Smartphone Code Transition Wiki] | * [https://wiki.mozilla.org/SmartPhone_Code_Transition Smartphone Code Transition Wiki] | ||
* | *Code transition work assigned to staff to be completed by EOB May 31. A few loose ends remain. | ||
* | *Still expect to merge into mozilla-central/master soon. | ||
* | **Tests are green on Linux 64 bit | ||
* | **Apps API will be removed shortly after merge - very large patch | ||
* | **C++11 standard library support enabled on all Tier-1 platforms. Progress on resolving C++11 related breakage. | ||
* | **Removing support for STL port will likely to cause B2G breakage | ||
*Dialer works for outgoing calls. Incoming calls still don’t work (missing alternative to system messages) | |||
**Some buttons on the call screen don’t work | |||
**Call log not working (missing alternative to system messages | |||
* | |||
* | |||
* | |||
|- | |- | ||
| Transition to Volunteer Community ( | | Transition to Volunteer Community (Valentin) | ||
! style="background:#00EC00;" | On Target | ! style="background:#00EC00;" | On Target | ||
| | | | ||
* [https://wiki.mozilla.org/B2G/Transition_Project B2G OS Transition Wiki] | * [https://wiki.mozilla.org/B2G/Transition_Project B2G OS Transition Wiki] | ||
* | * [https://docs.google.com/spreadsheets/d/1W-Vb9XOmoAKGWQXkJquTGPUb69NdmpJBVW1VXGFF2x8/edit?usp=sharing Public Transition Dashboard] | ||
* | * [http://mozilla-b2g.github.io/gaia/ Smartphone apps to transition to web apps] | ||
* [https://discourse.mozilla-community.org/t/web-or-dead/8782 Web or Dead Apps] | |||
* [https://docs.google.com/presentation/d/1YuQaLr-hiduT5xyT4TaiaUDYOsZAnmadduevAE6MOKo/edit?usp=sharing Getting Started mentoring presentation] | |||
* [https://discourse.mozilla-community.org/t/code-contributors-get-started/8625 Code Contributors Getting Started Guide] | |||
* [https://wiki.mozilla.org/B2G/Transition_Project/FAQ B2G FAQs] | |||
* [https://public.etherpad-mozilla.org/p/B2G_code Code Working Group] | |||
* | Global overview: | ||
* | *16 candidate volunteers for mentoring sessions, up from 13 a week ago; 165 people on Telegram, up from 144 a week ago; 261 people on IRC | ||
* Meetings on Thursday at 18:30 CEST/16:30 UTC/9:30am PDT/22:00 IST where you can participate in the following: | |||
** [http://j.mp/K03h7e B2G Vidyo room] | |||
** [https://telegram.me/B2GOS B2G OS telegram group] | |||
** #fxos IRC channel on irc.mozilla.org. | |||
Building and Porting (~10 volunteers) | |||
* There are regular volunteer builds for flame and volunteer builds for Open C | |||
* B2G installer addon signed, will be available on addons.mozilla.org soon | |||
Infrastructure (2 volunteers) | |||
* Mozilla Corporation can continue to provide B2G infrastructure but not the staff to keep it running. May want a separate instance of certain tools. | |||
* Need volunteers to run the infrastructure. | |||
* Potential contributors identified. | |||
Governance (8 volunteers) | |||
* Provisional Council created for the next 6 months, manifesto in progress | |||
|- | |- | ||
| Other Announcements | | Other Announcements | ||
| Line 173: | Line 195: | ||
| -- | | -- | ||
| | | | ||
* | * | ||
* | * | ||
|- | |- | ||
| Questions | | Questions | ||
| Line 180: | Line 202: | ||
| -- | | -- | ||
| | | | ||
* | * | ||
* | * | ||
|- | |- | ||
|} | |} | ||
Latest revision as of 14:49, 1 June 2016
<< Connected Devices Weekly Updates Home
| Program | Status | Notes | |
|---|---|---|---|
| Vaani | Validation (Lindsay/Sandip) | On Target |
|
| Project Link | Validation Stage (Julie/Preeti) | On Target |
Target market segment for study: Families in the US with 2 or more kids in elementary schools (PS-5), all living together in the same household; both the parents are working full time from 9am to 5pm and are between 30 & 40 yrs old, well educated, and in a medium to high income bracket.
The study, which included interviews of 18 families in the targeted segment, tested the following hypotheses:
Research data synthesized from these interviews tells us that busy families:
Current step: MVP definition
|
| Smart TV for 2.6 | Josh | On Target |
|
| Project SmartHome | Maria/Liz | On Target |
Research update
|
| Project Magnet | Maria/Francisco | On Target |
Hypotheses
Research
Development
Other
|
| Project Sensor Web | Cindy/Wesley | On Target |
|
| Porting | Nicole/David/Peter | On Target |
|
| Metrics for CD | Maria/Dylan | On Target |
|
| Research Team | Lindsay | On Target |
|
| Firefox OS Smartphone Sunset | Smartphone Commercial Sunset (Karen) | On Target |
|
| Code Transition (Julie) | On Target |
| |
| Transition to Volunteer Community (Valentin) | On Target |
Global overview:
Building and Porting (~10 volunteers)
Infrastructure (2 volunteers)
Governance (8 volunteers)
| |
| Other Announcements | -- | -- |
|
| Questions | -- | -- |
|