Firefox/Planning/2009-11-11: Difference between revisions

From MozillaWiki
Jump to navigation Jump to search
(personas 1.4 release summary)
Line 46: Line 46:


= Localization =
= Localization =
* Firefox 3.6 status is at  
* Fennec string freeze is next Tue, RC code freeze two weeks after that
* added el, fi, nb-NO, nn-NO, sr to Fennec all-locales
* Firefox 3.6 at 60 green locales, 15 with missing strings. 6 of those with 9-ish that haven't caught up since B1. Gandalf ETAs Fri-Mon if we reach out tonight.
* bn-IN, en-GB, eo, gu-IN, kn, ml, si, ta-LK, vi green without shipping so far. Need to work to get sign-offs still.


= QA =
= QA =

Revision as of 18:46, 11 November 2009

« previous week | index | next week »

Firefox/Gecko Delivery Meeting Details

  • Wednesdays - 11:00am Pacific, 2:00pm Eastern, 18:00 UTC
  • Mozilla Square Conference Room
  • 650-903-0800 or 650-215-1282 x92 Conf# 8605 (US/INTL)
  • 1-800-707-2533 (pin 369) Conf# 8605 (US)
  • irc.mozilla.org #planning for backchannel
  • (the developer meeting takes place on Tuesdays)

Upcoming Product Releases

Firefox

Firefox 3.0.16 / Firefox 3.5.6

Firefox 3.6 Beta

  • shipped an update last night, Nov 10
  • currently over 250,000 ADUs

Firefox 3.6 RC

  • code freeze target is November 18th
  • release target is November 26th

Fennec 1.0x beta 5

Labs

  • Bespin Embedded "preview" release. The first real standalone release of a Bespin embeddable text component, with docs and all.
  • Personas 1.4 (rc2 11/11, final 11/13): gives users more info about the categories and personas exposed through the extension and directs them to the web gallery for more personas from the categories as well as more info on the selected persona and its designer.

Support

Product Development

Firefox 3.6 / mozilla-1.9.2

future / mozilla-central

Localization

  • Fennec string freeze is next Tue, RC code freeze two weeks after that
  • added el, fi, nb-NO, nn-NO, sr to Fennec all-locales
  • Firefox 3.6 at 60 green locales, 15 with missing strings. 6 of those with 9-ish that haven't caught up since B1. Gandalf ETAs Fri-Mon if we reach out tonight.
  • bn-IN, en-GB, eo, gu-IN, kn, ml, si, ta-LK, vi green without shipping so far. Need to work to get sign-offs still.

QA

Release Engineering

Add-ons

  • AMO on-site this week. We won't be there to say this in person!
  • Compatibility up to 46%
  • AMO 5.3 launches this Thursday

Web Dev

Partners

Evangelism

Marketing/PR

Roundtable