Unified Telemetry status report October 7, 2015

Overall Project Health

Last week: Yellow

This week: Green

Exec Summary

  • Stakeholders have agreed to go 100% for both FHR V2 and Unified Telemetry in r42, then turn off FHR V2 in r43
  • Validation project becomes Data Continuity project; focus moves to building the executive dashboard from both sources of data (v2 and v4)
  • 5% release data from 42 is flowing and available for analysis in Spark. 5% release data not yet available in telemetry dashboard
  • Team works towards an October 13th unified telemetry presentation for executive stakeholders
  • Building a roadmap and documenting the pipeline as a product (how other groups in Mozilla will engage with the pipeline)

Risks/Issues

Description of Risks/Issues State Owner Plan to Resolve/Mitigation Target Date
V4 data validation Open Sam Waiting for more data; blocked on V2 outage. https://docs.google.com/document/d/1rvbCyVSzBsexer-0G7HdR_l1DczKAJdjzChxv0MjYco/ 10/10
Data continuity across V2/V4 Open Katie/Mark/Trink Plan, Metabug 11/2
Legal review Open BDS/Legal Meeting between groups 10/10
QA sign off (functional, load) Done Stuart Telemetry/Testing 8/24
Operations - data retention requirements Open Travis/Katie Eng team owes ops a doc defining ping types and data retention requirements 10/10
Remote about:healthreport content In progress Georg Kicked off localization. 11/2
Budget, size of UT pings In progress Mark/BDS Waiting for release data to spot any problems. https://metrics.services.mozilla.com/telemetry-budget-dashboard/ 8/10
Analysis difficulty Open Katie/tbd Roadmap has several items related to this, need to consolidate as a project 11/2
Access to the 5% sample Done Sam/Roberto Sam is using sample for Addons analysis 8/10

Accomplished for Last Period

please see http://benjamin.smedbergs.us/weekly-updates.fcgi/project/firefox-measurement

Project Mgt

  • completed sprint 1 for client and pipeline

Planned for Next Period

please see http://benjamin.smedbergs.us/weekly-updates.fcgi/project/firefox-measurement

  • Continue work on validation doc (tentative date for presentation to executives is October 13)
  • Meeting with Heather Crince on ramp up and legacy pipeline issues
  • sprint 2 in progress

meetings with other teams

Team initial sit down (informal) second meeting (formal) PRD? notes
iOS done TBD Barb working on PRD Dev track started
loop/hello Done TBD unknown if required Create UT data set
Fennec done done
Synch
FxA

Requests from other teams

Description State Owner Notes Target Date
FireFox OS In process Mark App/FTU pings in pipeline; next step is to load redshift tables Q4
Hello In process Katie Creating a derived stream: https://bugzilla.mozilla.org/show_bug.cgi?id=1181876 Q4
FxA Activity Event data for retention metrics In process whd Initial data set made available, still need to automate: https://bugzilla.mozilla.org/show_bug.cgi?id=1207015 Q4