Thunderbird/StatusMeetings/2009-01-13

From MozillaWiki
< Thunderbird‎ | StatusMeetings
Revision as of 22:27, 11 January 2009 by Standard8 (talk | contribs) (Initial version)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

last meeting | index | next week »

Thunderbird Meeting Details

Agenda

Calls For Help

Action Items

New

Open

  • clarkbw - send mail about drivers about triaging 3.0b1 wanted this week
  • dmose - triage [tb3needs] bugs

Closed

Thunderbird 3 Beta 2

  • For reference, Gecko 1.9.1b3: Jan 13 Code Freeze, Jan 15 QA, Jan 26 Release according to their plan.
  • clarkbw is release driver
  • gozer is build engineer
  • Proposed: Slushy string freeze from: Monday 2nd February 23:59 PST
  • Proposed: Firm string freeze and slushy Code freeze from: Thursday 5th February 23:59 PST
  • We need to drive bugs with large string changes, e.g., archive, auto config, activity manager. Some way of marking bugs needing strings would be useful.
    • Archive is getting reviewed now
    • Activity Manager is also under review
    • AutoConfig is further away from review - will try to get it closer this week.
    • Multiple e-mail addresses and tags needs strings.

Thunderbird 3

QA Updates

  • topcrashes
    • bug 471492 crash [@ nsImapMailFolder::CopyMessagesOffline]
    • bug 422907 nsMsgLocalMailFolder::GetTrashFolder (rootFolder is null)
    • bug 470804 NS_GetInnermostURI (CAPS?) (TB2) (patch landed on trunk - not 1.9.1 or 1.8.x)
    • bug 470808 nsProxyEventObject::CallMethod (imap)
    • bug 470835 nsMsgLocalMailFolder::AddMessage (should be fixed in 12-23 nightly) (optimistically gone)

Roundtable

Status Updates

davida
dmose
  • goals for next two weeks:
    • improve efficiency of personal daily planning
    • figure out how to excise more distractions from my day
    • finish driving tb3 plan towards better alignment with reality
    • drive JS-in-mailnews patches into the tree
    • triage message-reader bugs
    • finish GloDa review
nth10sd
jcranmer
Standard8

Non-goal activities:

Two week goals (end of week 2):

  • Complete Password Manager migration
  • Complete moving Leak and Bloat to Mozmill (if Mozmill issues are resolved)
  • Investigate if there is a simpler way to switch fully to toolkit autocomplete without doing too much work.
  • Look at Performance tests
    • Get some rough ideas of what & how.
    • See if we can get a Ts structure in place (or something else)
      • This would be useful for jemalloc and assessing implementing a packages-static file for unix.
asuth
bienvenu

Two week goals (week 2)

  • Finish folder archiving work. bug 451995
    • first patch is up for review. Other patches will be submitted soon.

Two week goals (week 1) Get back to autoconfig repo; try to get pieces of it ready for review.

emre
gozer

On vacation.

clarkbw
wsmwk
beckley
Penelope
KaiRo
rkent
rebron

Two Week Goal

  • PR coordination.
  • Continued web site work, coordinate web site localization.
  • 2009 event planning.
  • Continue work on Support/Help plan.
sipaq
mkmelin

Attendees